Siding

1st "complete" module

The Rural Station Module


Okay, not museum quality, but more than serviceable.
This is part of an eventual rural station/siding 4 module set.
eBay used station, some left-over ballast, and scenic-ing materials from last N-Scale foray (in the '80s).
Still needs some doodads for the station platform, some people and a couple of cars in the parking lot and road.
And who knows what else?

IMG_5641 IMG_5644

IMG_5642
IMG_5643



Duck-under and water tower

Duck-Under Seismic retrofit


Notched the base to better align (center) with the corner track.
Started leveling the "bridge" then realized its the south bench work that needed to be raised (we're now at a 2x4 + 5/8 plywood).
Added plexiglass sides for the inevitable bumps.
Track should be here tomorrow.

IMG_5608IMG_5609IMG_5610

Playing with the weathering powders


IMG_5612


Structure Building


Construction Milestone!

Milestone of progress with the construction phase

The "Duck-Under" bridge


Basic structure and functionality is there.
Need to level and position laterally (which will require some tweaking)
IMG_5589IMG_5592

An Ebay addition - string of ore cars


IMG_5601IMG_5603

The Yard Module


15" x 5'
Need to level the surface (somehow), the track work is designed, but purchse and actual install will be "later".
IMG_5602

BTW-

That polyiso foam is crap.
The covering doesn't remove well, it is not flat (many depressions across surface) and its expensive.
dd642a8e5b750fba6c6e4e72e66ab1b2

Also-


Removed the track and 2 switches from the siding modules. Scraped one module because my attempt to level the surface of the polyiso foam had made it much worse. The original modules, I think we sized wrong. They should be 310 mm. exactly the same as the ballast of the Kato straight + the 62 mm (1/4). One of the T-Trak sources had said 308 mm. I think that's wrong. But, cutting the 2" foam with the sharpened putty knife is not very "accurate" - very diffucult to be precise.

Never-the-less-


I believe the module constructon phase, and bench work, is complete! Thank gawd. My least favorite part.
Ordered enough track to finish the loop.
I think that's

PROGRESS


operational Phase 3 Rev A

Siding change

Rather than a siding (third track) I think may be better to use one of the dual track "mains" as a Station/Service/Siding track. Really allows both "mains" to serve as siding.
Siding2

Siding Realignment

Siding Track Realignment

Added a couple of 64mm straights at the siding switches to move the siding away from the mains. Shorter but still holds the 4 car passenger consist with the GP50.
IMG_5475IMG_5476IMG_5477

Siding Modules

Passing Siding
COMPLETE
Track layout
Key elements are, use of the 60mm straight, and not using the 64mm pieces!


screen-shot-2013-05-30-at-8.42.24-pm